Long Lead Items (LLI) Procurement Services for the Ubeta Main Development Project

The submission deadline for this tender has passed.

Tender Summary

The TOTAL ENERGIES EP NIGERIA LIMITED in Nigeria from African region had released this tender for Tenders are invited for Long Lead Items (LLI) Procurement Services for the Ubeta Main Development Project for Totalenergies Ep Nigeria Limited MANDATORY REQUIREMENTS a. To be eligible for the tender, interested tenderers are required to be pre-qualified and have a “LIVE” subscription status in the respective categories of the NipeX Joint Qualification Scheme (NJOS) database by the i. Pipeline Equipment, Pig launchers, Transmitters, Traps and Accessories-1.13.04 ii. Metering Equipment and Systems-1.10.06 iii. Drilling Machinery, Mud Equipment and Accessories-1.01.01 iv. Pipes and Tubes-2.01.01 v. Material Technology/Anti-Corrosion/Surface Protection Services-3.01.11; AND Surface treatment, sandblasting, painting, coating and fireproofing services-3.05.06. vi. Chemical Injection Systems-1.18.01 All successfully pre-qualified Tenderers per category will receive Invitations to submit their respective tender for the service. TECHNICAL CAPABILITY • Provide a list (with values) of all major individual contracts executed directly in the name of TENDERER Initially valued above $500k (or $1M for Pipeline procurement Scope) within the last 5 years, evidenced by Final or Provisional Acceptance Certificates or fully endorsed Contract/Purchase order with goods receipt, issued to Tenderer for similar product package(s). REGULATORY COMPLIANCE • Address of Registered Office in Nigeria and Name of Legal Entity; • Registration Number & Category (include CAC Form CO2 & CO7 and NUPRC Permit and COREN CERTIFICATES); • Provide documentary evidence of a liaison/partnership with a Nigerian registered company where any consortium partner is not registered in NipeX; • Name and address of the Ultimate Holding Contractor (if the Respondent is a subsidiary member of a group); Respondent’s office for this work; • A valid Tax clearance for the past 3 years. • For procurement of all LLIs, these are subject to NUPRC guidelines. FINANCIAL CAPABILITY i. Provide Company audited financial statements for the last three (3) years. Please provide translations where accounts are published in a language other than English. ii. Provide Financial Statements of Operating (not trading) Company and Ultimate Guarantor (e.g. Parent, holding companies etc.). iii. Provide confirmation letter from all financial Institution(s) that have provided short-term financing to the Respondent and details of existing third-party loans or guarantees (if any). iv. Provide evidence of Project Finance Plan for the executed work for the contract duration, including confirmation of financiers’ available line of credits, bank overdrafts and similar facilities. v. Provide other significant financial arrangements and state the values: (a)Third party borrowings; Inter-company loans; (c)Hire purchase agreements; (d)Government grants; (e)Debt Factoring Facility and (any other (please specify). vi. Provide details and potential values of any disputes currently in process with (a) Any TotalEnergies IV company (b) Any other Operator (Oil/Gas Company) and (c) Any other company not mentioned in (a) and (b). 5. NIGERIAN CONTENT REQUIREMENTS TotalEnergies is committed to the development of the Nigerian Oil and gas business in compliance with the Nigerian Content Act 2010 for Nigerian Content Development. As from the commencement of this Act, the minimum Nigerian Content in any project, service or product specification to be executed in the Nigerian oll and gas industry shall be consistent with the level set in the Schedule of the Act and any other targets as may be directed by the Nigerian Content Development and Monitoring Board (The Board). Bidder(s) shall comply with all the provisions of the Nigerian Content Act that relate to this advert and in particular comply with the minimum Nigerian Content percentage for the scopes which are covered in the Schedule of the Act. This also includes and any other requirement that may arise from time to time not explicitly stated in this advert, but which apply to the services in fulfillment of the Nigerian Content Act, in the submission of their Tender. As part of their submissions a. General NC requirement for all scopes • Tenderer shall be Nigerian companies having greater than 51% Nigerian shareholding to bid for this work scope on land. Provide evidence of company Ownership Structure form CO2 and CO7, registration on NOGIC OS and NUPRC certificate. • In Line with the NCD Human Capacity Development Initiative, Bidder shall commit to providing Project-Specific training, man-hour, budget, skit development and understudy plan for Nigerian personnel utilizing OGTAN registered trainer(s) or other approved NCOMB training institution(s). b. NIC requirement for each work scope. Pig Launcher/Pig Receiver. • Tenderer shall provide evidence of Location of in-country committed facilities (not limited to pig manufacturing facility & fabrication facility) to execute the work scope. • Tenderer shall provide evidence of • Category 1.2, 3, 4 or 5 Manufacturing and related services (MS) NCEC for Pig manufacturing. • Category 1, 2, 3, 4 or 5 Fabrication and construction NCEC demonstrating in-country capacity and capability to fabricate pig launchers and receivers : Multi-Phase Flow Meter • Tenderer shall provide evidence of valid letter as the sofe in-country representative of OEM for Multiphase flow Meter • Tenderer shall provide evidence of either • Category 1, 2, 3, 4 or 5 Manufacturing and related services (MS) NCEC for assemblage and testing of Multi-Phase Flow Meter in-country. • Category 1, 2, 3, 4 or 5 Procurement and Suppliers group NCEC for procuring Multiphase flow Meter Well head Control Panel: • Tenderer shall provide evidence of in-country facility for the assemblage of Well head/Xmas tree, • Testing and maintenance of Well head/Xmas tree, Tenderer shall provide evidence of valid letter as the sole in country representative of OEM for well head control panel. • Tenderer shall provide evidence of either i. Category 1, 2, 3, 4 or 5 manufacturing and related (MS) services NCEC for the assemblage & testing of Xmas tree and Well head in-country. ii. Category 1, 2, 3, 4 or 5 construction and moveable equipment for maintenance of Well Head. Line Pipes (16-Inch) Procurement: • Tenderer shall provide evidence of in-country facility for assemblage/manufacture of line pipe manufacturing. • Category 1, 2, 3, 4 or 5 Manufacturing and Related services NCEC for Line pipe manufacturing for threading facility. • Category 1, 2, 3, 4 or 5 Fabrication and Construction facility Line Pipe (16-inch) Coating: • Tenderer shall provide evidence of ownership of an in-country coating facility. • Tenderer shall provide evidence of category 1, 2, 3, 4 or 5 Manufacturing and Related services (MS) NCEC demonstrating ownership of the coating facility. Chemical Injection Package (Corrosion Inhibitor): Tenderer shall provide evidence of valid letter as the sole in-country representative of OEM for Chemical Injection Package • Tenderer shall provide evidence of either Category 1, 2, 3, 4 or 5 Manufacturing and related services (MS) NCEC demonstrating ownership of Production chemical Blend plant in-country Category 1, 2, 3, 4 or 5 Procurement and Suppliers group NCEC for procuring Chemical Injection Package. Bidders are to comply with the Petroleum Industry Act (PIA) NOTE: Failure to comply with the provision of the Nigerian Content Act 2010 or to demonstrate commitment to the development of the Nigerian Content Policy shall result in the disqualification of the bidder from the bidding process. Note: a. Failure to provide any of the listed documents or information, in the file format or accessible means requested, may automatically disqualify the Tenderer. b. All costs incurred in registering and prequalifying for this and other service categories in NIQ5 shall be borne solely by the Tenderer. c. This advertisement shall neither be construed as an invitation to Tender (ITT) nor a commitment on the part of TotalEnergies to award a contract to any supplier and/or associated companies, sub-contractors or agents. d. The ITT and any further progression of this tender shall be via NipeX. Interested bidders are therefore advised to ensure that their profiles in NipeX (including their valid official email address) accessible by their organization as this shall be the only means to transmit the ITT. e. Tendering process will be the NNPCL contracting process (Double Envelope Tenders (DET)) requiring pre-qualified companies to submit technical and commercial tender packages at the same time. Following a technical review, commercial tenders of technically/financially/contractually qualified contractors will be evaluated. f. Man hour figures for Capital Project Portfolios are best estimates to provide definition to the scope and do not constitute guaranteed quantities. g. TotalEnergies will only recognize and correspond with duly authorized officers of the pre-qualified bidders and NOT through individuals or agents acting on their behalf. h. Interested Tenderer(s) should note that TotalEnergies has very cordial relationship with the host communities of the sites where these services may be performed based on existing Memorandum of Understanding (MOU). Prospective tenderer(s) will be required to implement the obligations of the MOU as part of their contract. i. COMPANY reserves the right to award one or more contracts from this Call for Tender Process. published on 11 Jul 2023. The tender expired on 28 Jul 2023. This tender is sourced from Official Website and is eligible for suppliers interested in Construction work. Interested bidders can obtain further information including complete bid documents or ways to participate by registering on Tender Impulse and referencing via Tender Impulse ID 3317546.

Tender Details

Tender NoticeTI Ref: 3317546
Tender Organisation
TOTAL ENERGIES EP NIGERIA LIMITED
Tender Service
Worldwide
Tender Region
Tender Project Location
Tender CPV
45000000 : Construction work
Tender Document Type
Tender Notice
Tender Deadline
28 Jul 2023 Deadline passed
Tender Description
Tenders are invited for Long Lead Items (LLI) Procurement Services for the Ubeta Main Development Project for Totalenergies Ep Nigeria Limited MANDATORY REQUIREMENTS a. To be eligible for the tender, interested tenderers are required to be pre-qualified and have a “LIVE” subscription status in the respective categories of the NipeX Joint Qualification Scheme (NJOS) database by the i. Pipeline Equipment, Pig launchers, Transmitters, Traps and Accessories-1.13.04 ii. Metering Equipment and Systems-1.10.06 iii. Drilling Machinery, Mud Equipment and Accessories-1.01.01 iv. Pipes and Tubes-2.01.01 v. Material Technology/Anti-Corrosion/Surface Protection Services-3.01.11; AND Surface treatment, sandblasting, painting, coating and fireproofing services-3.05.06. vi. Chemical Injection Systems-1.18.01 All successfully pre-qualified Tenderers per category will receive Invitations to submit their respective tender for the service. TECHNICAL CAPABILITY • Provide a list (with values) of all major individual contracts executed directly in the name of TENDERER Initially valued above $500k (or $1M for Pipeline procurement Scope) within the last 5 years, evidenced by Final or Provisional Acceptance Certificates or fully endorsed Contract/Purchase order with goods receipt, issued to Tenderer for similar product package(s). REGULATORY COMPLIANCE • Address of Registered Office in Nigeria and Name of Legal Entity; • Registration Number & Category (include CAC Form CO2 & CO7 and NUPRC Permit and COREN CERTIFICATES); • Provide documentary evidence of a liaison/partnership with a Nigerian registered company where any consortium partner is not registered in NipeX; • Name and address of the Ultimate Holding Contractor (if the Respondent is a subsidiary member of a group); Respondent’s office for this work; • A valid Tax clearance for the past 3 years. • For procurement of all LLIs, these are subject to NUPRC guidelines. FINANCIAL CAPABILITY i. Provide Company audited financial statements for the last three (3) years. Please provide translations where accounts are published in a language other than English. ii. Provide Financial Statements of Operating (not trading) Company and Ultimate Guarantor (e.g. Parent, holding companies etc.). iii. Provide confirmation letter from all financial Institution(s) that have provided short-term financing to the Respondent and details of existing third-party loans or guarantees (if any). iv. Provide evidence of Project Finance Plan for the executed work for the contract duration, including confirmation of financiers’ available line of credits, bank overdrafts and similar facilities. v. Provide other significant financial arrangements and state the values: (a)Third party borrowings; Inter-company loans; (c)Hire purchase agreements; (d)Government grants; (e)Debt Factoring Facility and (any other (please specify). vi. Provide details and potential values of any disputes currently in process with (a) Any TotalEnergies IV company (b) Any other Operator (Oil/Gas Company) and (c) Any other company not mentioned in (a) and (b). 5. NIGERIAN CONTENT REQUIREMENTS TotalEnergies is committed to the development of the Nigerian Oil and gas business in compliance with the Nigerian Content Act 2010 for Nigerian Content Development. As from the commencement of this Act, the minimum Nigerian Content in any project, service or product specification to be executed in the Nigerian oll and gas industry shall be consistent with the level set in the Schedule of the Act and any other targets as may be directed by the Nigerian Content Development and Monitoring Board (The Board). Bidder(s) shall comply with all the provisions of the Nigerian Content Act that relate to this advert and in particular comply with the minimum Nigerian Content percentage for the scopes which are covered in the Schedule of the Act. This also includes and any other requirement that may arise from time to time not explicitly stated in this advert, but which apply to the services in fulfillment of the Nigerian Content Act, in the submission of their Tender. As part of their submissions a. General NC requirement for all scopes • Tenderer shall be Nigerian companies having greater than 51% Nigerian shareholding to bid for this work scope on land. Provide evidence of company Ownership Structure form CO2 and CO7, registration on NOGIC OS and NUPRC certificate. • In Line with the NCD Human Capacity Development Initiative, Bidder shall commit to providing Project-Specific training, man-hour, budget, skit development and understudy plan for Nigerian personnel utilizing OGTAN registered trainer(s) or other approved NCOMB training institution(s). b. NIC requirement for each work scope. Pig Launcher/Pig Receiver. • Tenderer shall provide evidence of Location of in-country committed facilities (not limited to pig manufacturing facility & fabrication facility) to execute the work scope. • Tenderer shall provide evidence of • Category 1.2, 3, 4 or 5 Manufacturing and related services (MS) NCEC for Pig manufacturing. • Category 1, 2, 3, 4 or 5 Fabrication and construction NCEC demonstrating in-country capacity and capability to fabricate pig launchers and receivers : Multi-Phase Flow Meter • Tenderer shall provide evidence of valid letter as the sofe in-country representative of OEM for Multiphase flow Meter • Tenderer shall provide evidence of either • Category 1, 2, 3, 4 or 5 Manufacturing and related services (MS) NCEC for assemblage and testing of Multi-Phase Flow Meter in-country. • Category 1, 2, 3, 4 or 5 Procurement and Suppliers group NCEC for procuring Multiphase flow Meter Well head Control Panel: • Tenderer shall provide evidence of in-country facility for the assemblage of Well head/Xmas tree, • Testing and maintenance of Well head/Xmas tree, Tenderer shall provide evidence of valid letter as the sole in country representative of OEM for well head control panel. • Tenderer shall provide evidence of either i. Category 1, 2, 3, 4 or 5 manufacturing and related (MS) services NCEC for the assemblage & testing of Xmas tree and Well head in-country. ii. Category 1, 2, 3, 4 or 5 construction and moveable equipment for maintenance of Well Head. Line Pipes (16-Inch) Procurement: • Tenderer shall provide evidence of in-country facility for assemblage/manufacture of line pipe manufacturing. • Category 1, 2, 3, 4 or 5 Manufacturing and Related services NCEC for Line pipe manufacturing for threading facility. • Category 1, 2, 3, 4 or 5 Fabrication and Construction facility Line Pipe (16-inch) Coating: • Tenderer shall provide evidence of ownership of an in-country coating facility. • Tenderer shall provide evidence of category 1, 2, 3, 4 or 5 Manufacturing and Related services (MS) NCEC demonstrating ownership of the coating facility. Chemical Injection Package (Corrosion Inhibitor): Tenderer shall provide evidence of valid letter as the sole in-country representative of OEM for Chemical Injection Package • Tenderer shall provide evidence of either Category 1, 2, 3, 4 or 5 Manufacturing and related services (MS) NCEC demonstrating ownership of Production chemical Blend plant in-country Category 1, 2, 3, 4 or 5 Procurement and Suppliers group NCEC for procuring Chemical Injection Package. Bidders are to comply with the Petroleum Industry Act (PIA) NOTE: Failure to comply with the provision of the Nigerian Content Act 2010 or to demonstrate commitment to the development of the Nigerian Content Policy shall result in the disqualification of the bidder from the bidding process. Note: a. Failure to provide any of the listed documents or information, in the file format or accessible means requested, may automatically disqualify the Tenderer. b. All costs incurred in registering and prequalifying for this and other service categories in NIQ5 shall be borne solely by the Tenderer. c. This advertisement shall neither be construed as an invitation to Tender (ITT) nor a commitment on the part of TotalEnergies to award a contract to any supplier and/or associated companies, sub-contractors or agents. d. The ITT and any further progression of this tender shall be via NipeX. Interested bidders are therefore advised to ensure that their profiles in NipeX (including their valid official email address) accessible by their organization as this shall be the only means to transmit the ITT. e. Tendering process will be the NNPCL contracting process (Double Envelope Tenders (DET)) requiring pre-qualified companies to submit technical and commercial tender packages at the same time. Following a technical review, commercial tenders of technically/financially/contractually qualified contractors will be evaluated. f. Man hour figures for Capital Project Portfolios are best estimates to provide definition to the scope and do not constitute guaranteed quantities. g. TotalEnergies will only recognize and correspond with duly authorized officers of the pre-qualified bidders and NOT through individuals or agents acting on their behalf. h. Interested Tenderer(s) should note that TotalEnergies has very cordial relationship with the host communities of the sites where these services may be performed based on existing Memorandum of Understanding (MOU). Prospective tenderer(s) will be required to implement the obligations of the MOU as part of their contract. i. COMPANY reserves the right to award one or more contracts from this Call for Tender Process.
Tender Bidding Type

Frequently Asked Questions About This Tender

Who has issued this tender, and what is it for?
The tender has been issued by TOTAL ENERGIES EP NIGERIA LIMITED in Nigeria. Such a type of tender falls under Construction work, within the Infrastructure and construction sector, and is listed on Tender Impulse with reference ID 3317546.
What are the key dates for this tender?
The notice was published on 11 Jul 2023 and submissions close on 28 Jul 2023. Late bids are rarely accepted in public procurement, so aim to have your documents ready several days before the closing date.
Which CPV codes apply to this tender?
It is classified under CPV codes 45000000, which correspond to Construction work. If your company supplies these products or services, these are the codes to save in your alert profile so no matching tender passes you by.
Can I submit my bid for this tender to Tender Impulse?
No - and this matters. Tender Impulse is a tender aggregation and alert service: we collect procurement notices from official sources around the world and list them in one place. We do not receive, forward or evaluate bids. Your bid for this tender must be submitted directly to TOTAL ENERGIES EP NIGERIA LIMITED, using the method described in the original tender document, before 28 Jul 2023. Tender Impulse provides complete assistance in submitting all bids posted on its website.
How do I get the bid documents and participation details?
Request a live demo on Tender Impulse and our tender experts will walk you through this listing, share the available documents, and explain how to submit your bid to TOTAL ENERGIES EP NIGERIA LIMITED. Subscribers also receive help with registration requirements and, where needed, translation of non-English notices - but the submission itself always goes from you to the buyer.
How can I find more tenders like this in Nigeria?
There are currently 161 live tenders of 34983 total tenders from Nigeria on Tender Impulse. You can browse them on our Nigeria tenders page, or save a search combining Nigeria with CPV codes 45000000 - we will then email you every new match on the day it is published.
How to prepare for this bid?
Suppliers must verify technical specifications, the delivery schedules and any other intrinsic details as provided in the complete bid documents before deciding to submit their bids. All necessary certifications and supplier registrations must be undertaken before participation.
Is this tender beneficial for me?
The procurement is applicable to companies in the Construction work and related industries. If you belong to this industry, you can review the technical documents before assessing your relevance to your company.
What is the procurement trend for Long Lead Items (LLI) Procurement Services for the Ubeta Main Development Project?
The public procurement trends for Long Lead Items (LLI) Procurement Services for the Ubeta Main Development Project can be assessed by viewing historical data and buying patterns for this product. Subscribed members can view and even download reports of tenders released in the past for their market research. This shall allow them to carefully prepare a compelling bid.

Explore More Construction work Tenders in Nigeria, African Region and Worldwide

Looking for more tenders like this one in Construction work? With millions of global procurement opportunities and new tenders added daily, Tender Impulse is your gateway to international and local contracting success. Whether you're targeting the Infrastructure and construction sector in Nigeria, or expanding across regions, we provide live, accurate and relevant updates every day.

Our platform sources tenders from national and local government portals, international development and funding agencies, municipal corporations, state authorities, NGOs, education ministries and public-private partnerships.

Daily Tender Updates Across 190+ Countries

Every day we add hundreds of new RFPs, RFQs, EOIs and contract awards across multiple sectors and geographies. This tender from Nigeria is just a sample of what's available right now - there are currently 161 live Nigeria tenders to explore.

Search Smarter with CPV and Industry Matching

Each listing is categorised using CPV codes such as 45000000, enabling precise filtering by tender type, location, industry, deadline and issuing organisation.

Start Your Tender Journey

Request a free live demo to unlock tenders customised to your sector, country and CPV categories - with alerts, documents and submission support.

API Integration — seamlessly integrate global tender data into your systems
AI-Powered Tender Intelligence for smarter bidding decisions
Publish Your Tenders — reach a global network of suppliers
Source Tenders Faster — discover verified tenders from across the globe
Chat with us