USA Tenders - 5 December 2024 (Page 7 of 7)
1,393 tenders published in USA on 5 December 2024.
Tender Impulse is your trusted global tender website and tender aggregator, offering access to tens of thousands of tenders from over 190 countries. On this page, explore all government tenders, business tenders, and e-tenders published in USA on 5 December 2024, across industries like Education & Training, Infrastructure and construction, Oil and Gas, Healthcare & Medical, IT-Software, Transportation & Mobility, Telecom.
This is page 7 of 7 for tenders published in USA on 5 December 2024.
Why Choose Tender Impulse for USA?
- Access a curated list of tender notices from official sources, including ministries, PSUs, and local procurement authorities.
- Daily updates of world tenders covering USA and beyond.
- Tailored listings for sectors like Education & Training, Infrastructure and construction, Oil and Gas, Healthcare & Medical, IT-Software, Transportation & Mobility, Telecom, including projects in EPC, defence, and infrastructure.
- Easy filters to sort tenders by publish date, keywords, CPV codes, or authority name.
Get Started with Full Access
With a simple free live demo, gain access to tender details, bidding documents, authority contacts, and real-time updates from USA.
6589177
59--CIRCUIT CARD ASSEMB
Deadline16 Dec 2024
6589178
VALVE ASSEMBLY,EMER
Deadline10 Dec 2024
6589179
Kaiserslautern Installation Support Services (KISS)
Deadline09 Dec 2024
6589180
SCREW,CAP,SOCKET HE
Deadline26 Dec 2024
6589181
VALVE/ACTUATOR ASSY
Deadline20 Dec 2024
6589182
SWITCH ASSEMBLY
Deadline10 Jan 2025
6589183
AMPLIFIER,RADIO FRE
Deadline10 Dec 2024
6589184
ROD,WELDING
Deadline20 Dec 2024
6589185
POWER SUPPLY, 26VLT
Deadline20 Dec 2024
6589186
SENSOR,GOVERNOR
Deadline20 Dec 2024
6589187
COMPUTER,DIGITAL
Deadline19 Dec 2024
6589188
70--CONTROLLER,DATA ENT
Deadline06 Jan 2025
6589189
INTERCOOLER,MPDE
Deadline12 Dec 2024
6589190
59--ASSY,HMI EXTENSION, IN REPAIR/MODIFICATION OF
Deadline03 Jan 2025
6589191
ACTUATOR,ELECTRIC
Deadline20 Dec 2024
6589193
Telephone Operator Services for U.S. Mission Spain & Andorra
Deadline15 Jan 2025
6589194
66--SERVOCYLINDER
Deadline06 Jan 2025
6589195
FMC LEXINGTON 2ND QTR- DRY BEANS
Deadline13 Dec 2024
6589196
53--CASTER,SWIVEL
Deadline20 Dec 2024
6589197
Advancing Sustainability in Performance, Infrastructure, and Reliability of the Energy Sector in the
Deadline31 Dec 2025
6589198
West Africa Food System Resilience Program (FSRP)
Deadline31 May 2027
6589199
16--UARRSI SLIPWAY,AIRC, IN REPAIR/MODIFICATION OF
Deadline11 Dec 2024
6589200
58--PROGRAMMER, EWSP
Deadline30 Dec 2024
6589201
15--TANK,FUEL,AIRCRAFT
Deadline07 Jan 2025
6589203
41--FAN,VANEAXIAL
Deadline16 Dec 2024
6589204
FLIGHT MANAGEMENT C
Deadline06 Jan 2025
6589205
15--TANK,FUEL,AIRCRAFT
Deadline07 Jan 2025
6589206
16--PISTON ASSEMBLY
Deadline08 Jan 2025
6589207
INBD GROUND SPOILER
Deadline20 Dec 2024
6589208
16--SPINDLE ASSEMBLY
Deadline06 Jan 2025
6589209
66--TIME DISTRIBUTION S
Deadline06 Jan 2025
6589210
FMC LEXINGTON 2ND QTR - TORTILLA ITEMS
Deadline13 Dec 2024
6589211
66--INDICATOR,TACHOMETE, IN REPAIR/MODIFICATION OF
Deadline06 Jan 2025
6589212
Health insurance services for the locally employed staff in the U.S. Embassy in Bogota
Deadline27 Jan 2025
6589213
59--CIRCUIT CARD ASSEMB, IN REPAIR/MODIFICATION OF
Deadline06 Jan 2025
6589214
61--POWER SUPPLY
Deadline06 Jan 2025
6589215
FMC LEXINGTON 2ND QTR - SUGAR
Deadline13 Dec 2024
6589216
61--POWER SUPPLY, IN REPAIR/MODIFICATION OF
Deadline06 Jan 2025
6589218
16--SENSOR,STICK POSITI, IN REPAIR/MODIFICATION OF
Deadline06 Jan 2025
6589219
59--DISPLAY,OPTOELECTRO, IN REPAIR/MODIFICATION OF
Deadline06 Jan 2025
6589220
30--UNIVERSAL JOINT,NON
Deadline16 Dec 2024
6589221
61--COVER,BATTERY BOX
Deadline16 Dec 2024
6589222
20--CHAIR,BARBER
Deadline16 Dec 2024
6589223
25--BRAKE DRUM
Deadline16 Dec 2024
6589224
15--BRACKET ASSY,CARGO
Deadline13 Dec 2024
6589225
FMC LEXINGTON 2ND QTR - SOUP BASE
Deadline13 Dec 2024
6589226
PCU
Deadline06 Jan 2025
6589227
FMC LEXINGTON 2ND QTR - SPICES
Deadline13 Dec 2024
6589228
Request for Information (RFI) for the Repair of the Antenna coupler on the Logic Control Unit AN/ARC-222
Deadline19 Dec 2024
6589229
16--MULTIFUNCTIONAL FLI
Deadline06 Jan 2025
6589230
VALVE,ECS
Deadline06 Jan 2025
6589231
Dockside: USCGC STONE DS FY25 FQ3
Deadline20 Dec 2024
6589232
Radiopharm-Tc-99m-Wilmington VAMC
Deadline10 Dec 2024
6589233
FMC LEXINGTON 2ND QTR - SALAD OIL & SHORTENING
Deadline13 Dec 2024
6589234
CLOSURE
Deadline06 Jan 2025
6589235
BIL Fire Life Safety at PHX Base Building and P50 TRACON
Deadline04 Feb 2025
6589236
PARTS KIT HOIST ANCHOR WINDLASS OVERHAUL KIT
Deadline06 Dec 2024
6589237
62--LIGHT,LANDING,AIRCR
Deadline16 Dec 2024
6589238
61--CONTROL,BATTERY CHA
Deadline16 Dec 2024
6589239
FILTER ELEMENT,FLUI
Deadline06 Jan 2025
6589240
20--HATCH,MARINE
Deadline16 Dec 2024
6589241
FMC LEXINGTON 2ND QTR - PANCAKES AND BISCUITS
Deadline13 Dec 2024
6589242
PEO LS Support Services
Deadline20 Dec 2024
6589243
FMC LEXINGTON 2ND QTR - PASTA & RICE
Deadline13 Dec 2024
6589244
FMC LEXINGTON 2ND QTR - PIZZA
Deadline13 Dec 2024
6589245
28--GEARBOX,ACCESSORY D, IN REPAIR/MODIFICATION OF
Deadline06 Jan 2025
6589246
59--ANTENNA
Deadline16 Dec 2024
6589247
FMC LEXINGTON 2ND QTR - SALAD DRESSINGS
Deadline13 Dec 2024
6589249
HX Fastener BOA Item 7001AA
Deadline19 Dec 2024
6589250
SHIPPING AND STORAG
Deadline20 Dec 2025
6589251
FMC LEXINGTON 2ND QTR - PACKAGED CAKES & PASTRIES
Deadline13 Dec 2024
6589253
FMC LEXINGTON 2ND QTR - NON-FOOD ITEMS
Deadline13 Dec 2024
6589254
FMC LEXINGTON 2ND QTR - OTHER DAIRY PRODUCTS
Deadline13 Dec 2024
6589255
Lubricating Cooler
Deadline13 Dec 2024
6589256
BOTTLE,FUEL
Deadline12 Dec 2024
6589258
FMC LEXINGTON 2ND QTR - JELLY
Deadline13 Dec 2024
6589259
FMC LEXINGTON 2ND QTR - KOSHER MILK
Deadline13 Dec 2024
6589260
48--ACTUATOR,ELECTRO-ME
Deadline16 Dec 2024
6589261
28--TUBE DRAIN ADAPTER
Deadline13 Dec 2024
6589262
61--COVER,BATTERY BOX
Deadline16 Dec 2024
6589263
59--SWITCH,TRIGGER
Deadline16 Dec 2024
6589264
53--CATCH,FRICTION
Deadline16 Dec 2024
6589265
16--VALVE,CABIN AIR PRE
Deadline13 Dec 2024
6589266
B--Purchase of a one-year silver service agreement
Deadline20 Dec 2024
6589267
25--CABLE AND CONDUIT A
Deadline16 Dec 2024
6589268
59--PRINTED WIRING BOAR
Deadline16 Dec 2024
6589269
25--ACCUMULATOR,HYDRAUL
Deadline16 Dec 2024
6589270
43--IMPELLER,PUMP,CENTR
Deadline16 Dec 2024
6589271
53--SEAL,PLAIN
Deadline16 Dec 2024
6589272
48--VALVE,REGULATING,FL
Deadline16 Dec 2024
6589273
20--WINDOW,MARINE
Deadline16 Dec 2024
6589274
48--VALVE,REGULATING,FL
Deadline16 Dec 2024
6589275
59--ATTENUATOR ASSEMBLY
Deadline16 Dec 2024
6589276
59--COIL,ELECTRICAL
Deadline16 Dec 2024
6589277
47--HOSE ASSEMBLY,METAL
Deadline16 Dec 2024
6589278
29--HOUSING,IMPELLER
Deadline16 Dec 2024
6589279
61--CONTROLLER,MOTOR
Deadline16 Dec 2024
6589280
48--DIAPHRAGM,VALVE,FLA
Deadline16 Dec 2024
6589281
30--CONNECTING LINK,RIG
Deadline16 Dec 2024
6589282
53--O-RING
Deadline16 Dec 2024
6589283
10--LUBRICATOR,AUTOMATI
Deadline16 Dec 2024
6589284
20--SHAFT,PROPULSION,SH
Deadline16 Dec 2024
6589285
48--VALVE,REGULATING,FL
Deadline16 Dec 2024
6589286
48--VALVE,REGULATING,FL
Deadline16 Dec 2024
6589287
48--VALVE,BALL
Deadline16 Dec 2024
6589288
59--CIRCUIT CARD ASSEMB
Deadline16 Dec 2024
6589289
48--VALVE,GATE
Deadline16 Dec 2024
6589290
59--SWITCH,RADIO FREQUE
Deadline16 Dec 2024
6589291
20--SEAT SPLIT
Deadline16 Dec 2024
6589292
59--SENSOR,CURRENT
Deadline16 Dec 2024
6589293
48--VALVE,SOLENOID
Deadline16 Dec 2024
6589294
48--VALVE,GATE
Deadline16 Dec 2024
6589295
28--PUMP ASSEMBLY - AND OTHER REPLACEMENT PARTS
Deadline27 Dec 2024
6589296
43--PUMP SUBASSEMBLY,ROTAR
Deadline16 Dec 2024
6589297
59--SWITCH,CODE INDICAT
Deadline16 Dec 2024
6589298
30--PISTON,LINEAR ACTUA
Deadline16 Dec 2024
6589299
47--STRAINER,SEDIMENT
Deadline16 Dec 2024
6589300
53--LEAF,BUTT HINGE
Deadline16 Dec 2024
6589301
48--VALVE,CHECK
Deadline16 Dec 2024
6589302
48--ACTUATOR,ELECTRO-ME
Deadline16 Dec 2024
6589303
48--VALVE ASSEMBLY,MANI
Deadline16 Dec 2024
6589304
48--VALVE,GATE
Deadline16 Dec 2024
6589305
59--RELAY,ELECTROMAGNET
Deadline16 Dec 2024
6589306
48--DAMPER,INNER,ANTI-I
Deadline16 Dec 2024
6589307
16--SHAFT,BLOCK AND PIS
Deadline16 Dec 2024
6589308
47--TUBE ASSEMBLY,METAL
Deadline16 Dec 2024
6589309
43--SLIPPER,PUMP
Deadline16 Dec 2024
6589310
47--COUPLING HALF,QUICK
Deadline16 Dec 2024
6589311
61--ROTOR,MOTOR
Deadline16 Dec 2024
6589312
61--POWER SUPPLY
Deadline16 Dec 2024
6589313
59--ELECTRONIC COMPONEN
Deadline16 Dec 2024
6589314
53--PACKING WITH RETAIN
Deadline16 Dec 2024
6589315
48--SEAT,VALVE
Deadline16 Dec 2024
6589316
20--TOOL,COMPRESSION,ST
Deadline16 Dec 2024
6589317
47--TUBE,METALLIC
Deadline16 Dec 2024
6589318
47--TUBE,METALLIC
Deadline16 Dec 2024
6589319
30--CALIPER ASSEMBLY,DI
Deadline16 Dec 2024
6589320
Spring 2025 Tree Planting Project
Deadline07 Jan 2025
6589321
Mill Bridge Nature Park Amphitheater Renovation Project - Advertisement for Bids
Deadline10 Dec 2024
6589322
5-01? Falls Rd & Port Washington Rd Signal Project
Deadline19 Dec 2024
6589323
Invitation to Bid - Knox Cattle Co Dam Rehabilitation
Deadline19 Dec 2024
6589324
RFP-DRI Small Projects Fund Grant Project Management & Administration Consultant Services
Deadline06 Jan 2025
6589325
Custodial Equipment, Parts & Accessories (Percetage) #JCPS-8415
Deadline16 Dec 2024
6589326
IFB25000237 | Crane Truck
Deadline16 Dec 2024
6589327
RFQ - Knox Cattle Company Dam (KCCD) Rehabilitation
Deadline12 Dec 2024
6589328
Advertisement for Bids ? Pelican Park Pavilion & Kitchen and Restroom Project
Deadline07 Jan 2025
6589329
UP-Pollock Halls Phase 3A
Deadline11 Dec 2024
6589330
Invitation to Bid on the Cottage Grove E. Main Street Revitalization Project
Deadline18 Dec 2024
6589331
SOQ Professional Design/Consulting Services - Annual Request for Qualifications
Deadline31 Dec 2025
6589332
59--SOLENOID ASSEMBLY, IN REPAIR/MODIFICATION OF
Deadline27 Dec 2024
6589333
47--COUPLING HALF,QUICK
Deadline16 Dec 2024
6589334
70--BASE SERVER W/P600
Deadline27 Dec 2024
6589335
59--CIRCUIT CARD ASSEMB
Deadline27 Dec 2024
6589336
48--VALVE,FLOW CONTROL, IN REPAIR/MODIFICATION OF
Deadline27 Dec 2024
6589337
61--POWER SUPPLY ASSEMB
Deadline27 Dec 2024
6589338
16--HEAT EXCHANGER,LEFT
Deadline27 Dec 2024
6589339
47--COUPLING HALF,QUICK
Deadline16 Dec 2024
6589340
59--RELAY ASSEMBLY GROU
Deadline16 Dec 2024
6589341
48--VALVE,GATE
Deadline16 Dec 2024
6589342
61--CONTROLLER,WINCH
Deadline16 Dec 2024
6589343
16--HOUSING,STATOR ASSY
Deadline16 Dec 2024
6589344
53--WASHER,FLAT
Deadline16 Dec 2024
6589345
53--BRACKET,MULTIPLE AN
Deadline16 Dec 2024
6589346
29--HOUSING,COOLANT PUM
Deadline16 Dec 2024
6589347
25--PAD,THRUST
Deadline16 Dec 2024
6589348
48--SERVOVALVE,HYDRAULI
Deadline16 Dec 2024
6589349
48--VALVE ASSEMBLY,MANI
Deadline16 Dec 2024
6589350
59--RADIATOR,ANTENNA EL
Deadline16 Dec 2024
6589351
15--HEADING RELAY BOX A
Deadline16 Dec 2024
6589352
59--AMPLIFIER,RADIO FRE
Deadline16 Dec 2024
6589353
61--ROTOR,GENERATOR
Deadline16 Dec 2024
6589354
30--PAWL
Deadline16 Dec 2024
6589355
25--DISK,CLUTCH,VEHICUL
Deadline16 Dec 2024
6589356
10--CONE ASSY,TAIL
Deadline16 Dec 2024
6589357
10--BARREL,AUTOMATIC GU
Deadline16 Dec 2024
6589358
59--CIRCUIT CARD ASSEMB, IN REPAIR/MODIFICATION OF
Deadline27 Dec 2024
6589359
48--VALVE,GATE
Deadline16 Dec 2024
6589360
59--PLUG ASSEMBLY,TIP
Deadline16 Dec 2024
6589361
25--WINDOW,VEHICULAR
Deadline16 Dec 2024
6589362
29--DETECTOR,METALLIC P
Deadline16 Dec 2024
6589363
25--SHOCK ABSORBER,DIRE
Deadline16 Dec 2024
6589364
59--DIVIDER,POWER,RADIO
Deadline16 Dec 2024
6589365
59--SWITCH,PRESSURE
Deadline16 Dec 2024
6589366
61--CONTACTOR,MAGNETIC
Deadline16 Dec 2024
6589835
RFI Lease Land at Luke AFB
Deadline19 Dec 2024
6589836
Request For Information: AOC In-trench wiring duct system and flatwire replacement
Deadline10 Jan 2025
6589847
Repair of NSN 5996015300722 for the GPS Program (Drive Amplifier)
Deadline05 Jan 2025
6589848
Local Telecommunication Services (LTS)
Deadline20 Dec 2024
6589849
Intent to Sole Source - Definitive Cost Estimating Data
Deadline12 Dec 2024
6589850
R408 - Support-Professional: Program Management/Support
Deadline20 Dec 2024
6589852
Pre-Solicitation Synopsis for the Overhaul of the Computer Subassembly for the UH-60 Black Hawk
Deadline20 Dec 2025
6589853
Det 3 Rifle Gore 1760 Notice of Intent to Sole Source
Deadline13 Dec 2024
6589854
Motor Lifeboat Work
Deadline19 Dec 2024



