Bangladesh Tenders - 24 June 2021
64 tenders published in Bangladesh on 24 June 2021.
Tender Impulse is your trusted global tender website and tender aggregator, offering access to tens of thousands of tenders from over 190 countries. On this page, explore all government tenders, business tenders, and e-tenders published in Bangladesh on 24 June 2021, across industries like Infrastructure and construction, Repair, Maintenance & Installation, Industrial Machinery & Equipment, Telecom, Healthcare & Medical, IT-Software, Energy, Transportation & Mobility, Furniture & Furnishings, Education & Training, Meters.
Why Choose Tender Impulse for Bangladesh?
- Access a curated list of tender notices from official sources, including ministries, PSUs, and local procurement authorities.
- Daily updates of world tenders covering Bangladesh and beyond.
- Tailored listings for sectors like Infrastructure and construction, Repair, Maintenance & Installation, Industrial Machinery & Equipment, Telecom, Healthcare & Medical, IT-Software, Energy, Transportation & Mobility, Furniture & Furnishings, Education & Training, Meters, including projects in EPC, defence, and infrastructure.
- Easy filters to sort tenders by publish date, keywords, CPV codes, or authority name.
Get Started with Full Access
With a simple free live demo, gain access to tender details, bidding documents, authority contacts, and real-time updates from Bangladesh.
1022591
Construction of Mamata Tower Shopping Complex at Sher-e Bangla Nagar, Dhaka (Sub-Head: Supply & Installation of CCTV System)
Deadline07 Jul 2021
1022593
Annual servicing, maintenance and operation of 800 kg, 8-stop (Otis Sigma brand) lift at Kakrail Audit Building, Dhaka. (Term: 01-07-2021 to 30-06-2022 = 12 months).
Deadline04 Jul 2021
1022595
Construction of Surface Drain around the Female Student Hostel Building at HSTU, Dinajpur
Deadline12 Jul 2021
1022597
Supplying of bench in different School under Burichang Upazila
Deadline11 Jul 2021
1022598
On CN Branch Construction of Bank protection wall at Km. 23/9-10Right side 275-0 including repairs to cess & Bank other allied works in between HZI-NZA station as per drawing.
Deadline08 Jul 2021
1022599
Repairing works of Shed of Garbage Treatment Plant beside Trenching Ground at 37 no Ward.
Deadline04 Jul 2021
1022600
on LKM-NKA branch line Manufacturing fitting & fixing Caution Board 1For Speed Breaker of Authorized LC gate Caution Board 2 Authorized LC gate Whistle Board for Authorized gate
Deadline08 Jul 2021
1022603
On LKM-CDR branch Repairing road surface and Barriar Pole with overhauling of level crossing Gate No. LC-1/T at Km. 130/2-3 in between LKM-CIR station with other allied works.
Deadline08 Jul 2021
1022604
On CN branch Construction of ballast protection wall with Precast R.C.C Slab and Post at Km. 20/5-21/1-2Left side2200-0 rft including repairs to cess & bank with other allied works
Deadline08 Jul 2021
1022605
Re-construction of boundary wall at Chandpur officers rest house with other ancillary works as per approved drawing.
Deadline08 Jul 2021
1022608
Repairing, painting and vanishing various objects like almirah, side locker, bed, door and other wooden furniture of DMGH and supplying BP machine at DMGH
Deadline08 Jul 2021
1022609
AT CGD Installation of shallow tube-well with submarsible water pump 2Nos. located at TXR office and C.I./RNB office compound area with other allied works.
Deadline08 Jul 2021
1022611
Construction of Four Wheeler Motor Garage at Magura ESU under WZPDCL.
Deadline12 Jul 2021
1022613
At CDR Construction of Water Hydrant at CDR Station 1290 Rft with Water Connection and other allied works as per approved drawing.
Deadline08 Jul 2021
1022614
Construction of Guild Wall & Approach Road at Bangabondu Gate.Under Chandpur Zillaparishad. B) Development of R. C.C Road at 14 No Word Mrida Bari Road.Under SaderUpazilla.
Deadline06 Jul 2021
1022626
On Main line Construction of Ballast Wall at 50/2-7 up line 1800 rft between BYA-BTKAK.M. 65/3-7 DN line 1000 rft Between MSTN-CNKA Station Total 2800 Rft with Others allied works
Deadline08 Jul 2021
1022629
Supply Installation and Testing Active Network Equipment with DC Power System Dhaka Mymensingh Sylhet & Chattogram Division
Deadline12 Jul 2021
1022632
On main line Construction of Bank protection wall Rail Pilling With Drum Sheet Bandelling at KM. 65/8-66/0 Up line 200 Rft and Km. 65/8-9 Dn line 170 Rft between MSTN-CNKA Station
Deadline08 Jul 2021
1022634
Medicine- Package-4
Deadline05 Jul 2021
1022635
Yearly Operation and maintenance of 03 Nos passenger Lift at District Chief Judicial Magistrate Court Building Bogura.
Deadline07 Jul 2021
1022636
Supply of office stationaries at BMA, Anwara, Chattogram,
Deadline08 Jul 2021
1022638
On Main line Construction of Ballast Wall at K.M. 90/3-91/8 DN Line 2600 rft Between FNI-SRS Station K.M. 117/1-3 DN line 400 rft between NKT-NOT station Total 3000 Rft with Others
Deadline08 Jul 2021
1022640
At SLHR- Through repairs to Qrt. No. E/9 A type-2 Units E/15 S type- 2 units E/11 A type 2 Units Total 6 Units including roof treatment and other allied works .
Deadline08 Jul 2021
1022642
Supply of Internet services minimum 200 (two hundred) MBPS Bandwidth at BMA Anwara Chattogram.
Deadline08 Jul 2021
1022648
Pole, Line (33 Kv, 11 Kv, 11/.4 Kv) and Transformer Shifting of Monihar to Muroli more under Sales & Distribution Division-1 WZPDCL, Jashore Due to road Extension.
Deadline13 Jul 2021
1022650
Construction of front Side Boundary wall and Renovation of other boundary wall at S&D-4 Khulna under WZPDCL.
Deadline12 Jul 2021
1022651
Establishing 560 Model Mosques and Islamic Cultural Centers in Zilla and Upazilla of Bangladesh one at Rangpur Sub-head: Supply and Installation Work
Deadline13 Jul 2021
1022653
Construction of Bank protection wall at KM. 41/1-2 DN line 150 Rft between STK-BYA Station with other allied works as per drawing.
Deadline08 Jul 2021
1022654
Medicine- Package-7
Deadline05 Jul 2021
1022655
Engagement pump operator, security guard and cleaner including cleaning materials for kalyanpur and rampura storm water pumping station.
Deadline06 Jul 2021
1022659
Medicine- Package-11
Deadline05 Jul 2021
1022660
Installation of 6 no. Shallow Tube well at Different Asron Project at Thakurgaon under Revenue Budget at Department of Public Health Engneering Fy 2020-2021.
Deadline12 Jul 2021
1022661
Damaged Infrastructure repairing work of Fulbaria Supermarket Block-C, ward 34, Dhaka South City Corporation.
Deadline14 Jul 2021
1022663
Procurement of different types of spare parts of gas generator B1 of Phase-2.
Deadline07 Jul 2021
1022665
Construction of Water Hydrant at NKA Station 700 Rft with Water Connection and other allied works as per approved drawing.
Deadline08 Jul 2021
1022666
4 Item Lab Equipment
Deadline07 Jul 2021
1022667
Establishing 560 Model Mosques and Islamic Cultural Centers in Zilla and Upazilla of Bangladesh one
Deadline13 Jul 2021
1022668
Construction of extended administrative building with Hall Room.
Deadline26 Jul 2021
1022669
Annual operation and maintenance of 2nos 800 kg 13-stop passenger lift
Deadline04 Jul 2021
1022670
Annual maintenance, operation and servicing of Otis Sigma brand 1 passenger lift of 800 kg capacity with 6 stops in 6-storey Maritime Cell building of Ministry of External Affairs
Deadline04 Jul 2021
1022671
Construction of Four Wheeler Motor Garage at Narail ESU under WZPDCL.
Deadline12 Jul 2021
1022672
Construction of Sub-station House, Supplying and Installation of necessary equipments for 500 KVA Sub-station at HSTU, Dinajpur
Deadline12 Jul 2021
1022673
Vertical Extension of 7th floor over existing 6th floor of Regional Public Administration center with Civil works, Internal Sanitary & Water Supply works of (Building No-2) at 49,
Deadline14 Jul 2021
1022674
Manufacturing, supplying and Installation of 6 (Six) nos. M.S. Lift Gate with 3 (Three) nos. Padestal type hoisting device & 3(Three) Nos. Hand wheel type hoisting device (Dhalewar
Deadline12 Jul 2021
1022675
Construction of 4-Storied Academic Building with 4-Storied foundation in/c Sanitary Water supply and Electrification works for Chowganga Shahid Smrity High School at Itna Kishorega
Deadline15 Jul 2021
1022677
Maintenance and operation of annual servicing of 1nos 4 stop 10 passenger 800 kg passenger lift (Otis Sigma brand) of Bangladesh Supreme Court Bar Association (four) story annex bu
Deadline04 Jul 2021
1022679
Development work of playground at Mendipur near Al Helal club under word 70 DSCC.
Deadline07 Jul 2021
1022681
PAC solution chemical tank & fittings -10 items
Deadline08 Jul 2021
1022682
Development of Road from Ampotti more to Shwadeshi Bazar & Old Police club Road by BC in Ward No. 08.
Deadline08 Jul 2021
1022684
Construction of RCC Pavement Road in front of Female Student Hostel Building at HSTU, Dinajur
Deadline12 Jul 2021
1022686
Construction 900mm dia RCC pipe drain from Mr. Kodus house to Mr. Shahjahans house near BSCIC power house in Ward No.-20.
Deadline08 Jul 2021
1022697
Construction of internal Bituminous Carpeting (BC) Road at Anonna Housing R/A in Ward No.02.
Deadline08 Jul 2021
1022699
Providing, Installation & commissioning of new AC (Air Conditioner each-2 Tons) for Office room of Dept. Chairmanâ??s in HSTU, Dinajpur.
Deadline12 Jul 2021
1022700
Construction of Boundary Wall and Gate with Guard Room for Female Student Hostel at HSTU, Dinajpur
Deadline12 Jul 2021
1022702
Construction of 2 storied RCC WASH Block for MT & boys and FT & girls including all associated construction sanitary plumbing & electrical works at different primary schools of Lak
Deadline06 Jul 2021
1022703
Manufacturing, Supplying, Fitting and Fixing of Female Student Hall Furniture at HSTU, Dinajpur
Deadline12 Jul 2021
1022704
a) Construction of Drain and CC Road at Lichu Bagan bylane to Badsha miah house to babul robidas house at ward no-06. b) Construction of Drain and CC Road at Lichu Bagan road to sh
Deadline08 Jul 2021
1022705
a. Construction Footpath from Cantonment 1st gate to Existing khal and Brick Drain at backside of Commander house b. Maintenance work of Bipin Park. c. Construction of Mother Care
Deadline08 Jul 2021
1022707
Construction and Extension of (a) Horindhara High School under Maynamati UP & (b) Shikarpur Darul Olum Zilania Alim Madrasha under Mokam UP Burichong, Cumilla.
Deadline11 Jul 2021
1022708
Reconstruction Boundary wall with different Moral in front of Nagar Bhabon.
Deadline08 Jul 2021
1022901
Supply of big Trailer,Crane,Tools etc. on serial basis,Supply of Oxygen,Acetylene,Argon,LPG Gas etc. and Construction of Temporary fencing & shade at different places for 1st MI of
Deadline14 Jul 2021
1024117
City Surveillance system at Cumilla City Corporation with AI Camera and Face Detection, Number Plate Recognition
Deadline15 Jul 2021
1024217
Project Director, Installation of Eight Lakh & Fifty Thousand Smart Pre-payment Meters under DPDC Area Project
Deadline27 Jul 2021
1024244
Project Director, Installation of Eight Lakh & Fifty Thousand Smart Pre-payment Meters under DPDC Area Project.
Deadline29 Jul 2021



